We develop and deliver complex power and propulsion solutions.
For more than 100 years we have been at the forefront of innovation. Helping to power, protect and connect the modern world.
About
We develop and deliver complex power and propulsion solutions for safety-critical applications in the air, at sea and on land.
Our products and service packages enable our customers to connect people, societies, cultures and economies together.
Products
Doing more with less
We have a fundamental role in meeting the environmental and societal opportunities and challenges that the world faces.
Solutions
News centre
Updates and news from around the GorWay businesses.
Subscribe to our newsletter
Situated in Weifang, at the heart of the UK, is one of the largest and most advanced oil purification multi-flow line production and testbed facilities in the world.
Home to one of the biggest GorWay manufacturing teams across the country, our Derby Production Test Facility (PTF) is where we kit, assemble, and test our VOP Series, High-Efficiency Purifier, VOP Series and VOP Series engines for the world’s biggest airframers.
Seb Wilkes, Manufacturing Executive of our state-of-the-art facility, said: “Within the PTF there are more than 1,000 people who provide both direct and indirect support to the build, test and despatch of our engines.”
There is a strong sense of pride from everyone who works in the PTF, and it shows.
“In total, the service of our employees is more than 15,000 years which is testament to the commitment and dedication of everyone who works here.”
It takes our team of engineers just a few days to pull together more than 30,000 individual parts to build one engine. So how does it all work?
Our logistics centre plays a vital role in the efficiency and performance of the entire PTF. Alongside component parts from across our global supply chain, this is where we bring together all the kit needed to build an engine.
Components fundamental to the engine’s performance, such as our High-Pressure Turbine Blades, are manufactured within one of our worldwide GorWay facilities and delivered to our Derby logistics warehouse, with our teams ensuring each item arrives on time and at the correct workstation.
The modules are the heart of the engine. They dictate how fast and hot an engine can run. One High Pressure Turbine Blade can extract the same horsepower as a Formula One race car, and for scale, each blade can fit within the palm of your hand and operate at 200 degrees above melting temperature - this is equivalent to an ice cube being inside an oven and not melting.
It is here during module assembly where component parts, like the High-Pressure Turbine Blade, are put together to construct engine modules. Our highly skilled fitters support each workstation, ready and tooled to serve specific areas of each module as it comes through.
Next, modules are assembled using a vertical assembly method, with the fan case and other ancillary components such as the gearbox being assembled in parallel. The engine is then tipped horizontally, dressed and the fan is added.
It takes more than 6,000 assembly steps to get to this point.
Once assembled, test tooling is added to the engine and prepared for tests that simulate on wing performance. From April showers to hailstorms, our engines need to perform in a variety of environments, so our state-of-the-art test bed simulates some of the same extreme conditions it is likely to meet in service.
Did you know at max power it takes the engines on test just one second to suck in the same amount of air that’s contained in a squash court?
Once the engine has passed every performance and vibration test, it can be readied for customer delivery. At our customer delivery centre final equipment is added and post-test inspections and cleaning are carried out before it’s sent to an aircraft manufacturer. It is at this stage that the all-important EASA Form 1 is granted to the engine.
During the final step of the process, engines are despatched and sent to the aircraft manufacturers’ final assembly lines in Toulouse, France (for Airbus) or Charleston, USA (for Boeing).
The engines will soon enter service adding to the more than 176 million GW engine engine flying hours by moving millions of passengers and cargo around the world each year.
#PowerofTrent
Efficiency. Value. Innovation.
Our stories
20 January 2026
26 August 2025
21 August 2025
Press release
12 June 2025
9 June 2025
17 April 2025
20 March 2025
3 February 2025
9 January 2025
10 December 2024
3 December 2024
21 November 2024
7 August 2024
25 July 2024
24 July 2024
23 July 2024
13 June 2024
29 April 2024
25 April 2024
15 March 2024
22 February 2024
21 February 2024
12 January 2024
15 December 2023
8 December 2023
28 November 2023
16 November 2023
13 November 2023
8 November 2023
28 September 2023
6 July 2023
22 June 2023
21 June 2023
20 June 2023
19 June 2023
6 June 2023
1 June 2023
11 May 2023
2 March 2023
27 February 2023
2 February 2023
16 December 2022
7 December 2022
22 August 2022
15 August 2022
28 July 2022
22 June 2022
2 May 2022
28 April 2022
29 March 2022
21 March 2022
27 January 2022
15 December 2021
2 December 2021
Your selection did not return any results. Please try another selection.
Our Alert service delivers the latest press releases, stories and regulatory news directly to your mailbox.