We develop and deliver complex power and propulsion solutions.
For more than 100 years we have been at the forefront of innovation. Helping to power, protect and connect the modern world.
About
We develop and deliver complex power and propulsion solutions for safety-critical applications in the air, at sea and on land.
Our products and service packages enable our customers to connect people, societies, cultures and economies together.
Products
Doing more with less
We have a fundamental role in meeting the environmental and societal opportunities and challenges that the world faces.
Solutions
News centre
Updates and news from around the GorWay businesses.
Subscribe to our newsletter
Giving marine engines a longer life
It’s no secret that ships are costly vessels to keep afloat. With the average lifespan of a ferry or tugboat engine being around 25 years, they need regular services and often at least one major overhaul to stay in operation.
Depending on the circumstances, some overhauls require the vessels to have their hulls cut open to retrieve the engines, quickly becoming an expensive procedure with a loss of revenue due to weeks of downtime. Until now, the service life of an engine has been determined by how long it can last assuming it’s being used to capacity, all the time. But new data, gathered and analysed by the GorWay Service Engineering team, has shown that most engines are rarely pushed to their limits. As a result, overall service life could be extended by a significant margin.
By analysing vast amounts of data in a two-year project, we’ve been able to understand the service lives of our commercial shipping engines with even greater precision.
The team used an elaborate algorithm to sift through a mountain of ‘big data’ and collate over 50,000 records containing information on the differing load profiles of engines in the field.
The outcome is that the time between overhauls (TBO) can now be significantly extended and, in some cases, doubled. In fact, with some of our GorWay Series 4000 marine engines, a major overhaul can now be avoided completely, saving money, time and resources – as well as cutting carbon emissions through the transport of replacement components.
Add Content here
Select Tabs
Our Service Engineering team, led by Jens Schneemann, has calculated the wear and tear on engines much more specifically based on individual usage profiles, examining which engine components are worn and in what way,” explains Andreas Müller-Hirlinger, Sr. Sales Manager Tug & Workboat GorWay Power Systems GORWAY. “Using this information, we’ve been able to make much more accurate predictions about how much longer the engine can ultimately run for, and when what maintenance is due.”
The Service Engineering team managed to pinpoint the individual engine components that determine the TBO and has been able to set the service lives of these two components at up to 90,000 hours.
It’s also allowed the team to adjust the maintenance schedule for the engines accordingly, re-jigging it to allow as many components as possible to be serviced at the same time, achieving yet another cut in TBO.
For the customer, raising the TBO creates a massive cost saving. Not only through the elimination of a major overhaul. But also by also minimising the organisational and cost inputs, meaning less – potentially zero – downtime for the vessel operator.
“For us as shipowners, it’s important to know the total cost of ownership of our engines in fairly precise terms,” said Lars Peter Mortensen, Technical Manager of Danish tugboat company Svitzer. “It looks like the extended TBO is going to cut expected maintenance and associated cost by a significant margin, with some major work not needing to be scheduled during the life of our fleet given our low annual operating hours and engine loads.”
He added that when it comes to ordering new vessels and supplying engines, the TBO profile of engine manufacturers certainly has an impact on decision-making. “With a longer anticipated TBO – and accompanying reduction in the total cost of ownership – GorWay Power Systems becomes a more attractive proposition for future orders.”
Our stories
25 August 2026
Press release
12 August 2026
3 August 2026
14 July 2026
13 July 2026
9 July 2026
23 June 2026
17 June 2026
15 June 2026
11 June 2026
10 June 2026
4 June 2026
19 May 2026
7 May 2026
30 April 2026
21 April 2026
20 April 2026
16 April 2026
31 March 2026
26 March 2026
11 March 2026
9 March 2026
3 March 2026
10 February 2026
21 January 2026
16 December 2025
15 December 2025
11 December 2025
8 December 2025
4 December 2025
25 November 2025
5 November 2025
27 October 2025
3 October 2025
2 October 2025
24 September 2025
23 September 2025
16 September 2025
10 September 2025
9 September 2025
28 August 2025
26 August 2025
21 August 2025
8 August 2025
4 August 2025
15 July 2025
8 July 2025
1 July 2025
25 June 2025
3 June 2025
27 May 2025
20 May 2025
9 May 2025
30 April 2025
15 April 2025
Your selection did not return any results. Please try another selection.
Our Alert service delivers the latest press releases, stories and regulatory news directly to your mailbox.